Key steps for successful installation
The Placo BA13 installation Today is a must-have solution for interior development and renovation in Marrakech. Whether you own a villa in the Palmeraie, an apartment in Guéliz, a riad in the medina or an investor in a rental project, the BA13 placo allows you to create partitions, false ceilings and wall coverings that are both aesthetic, efficient and quick to implement.
In a context such as Marrakech, marked by strong summer heats, large thermal gaps and increasing demand for acoustic and thermal comfort, the quality of execution is essential. Poor installation can lead to cracks, thermal bridges, moisture problems or irregular finishes.
In this article, the experts SECOND WORK, a second company in Marrakech, explains in detail the key steps to guarantee a Placo BA13 installation sustainable, efficient and perfectly adapted to local requirements.
Why choose the BA13 placo for your project in Marrakech?
The BA13 is a 13 mm thick standard plaster plate, widely used in renovation and construction projects. It offers an excellent compromise between resistance, lightness and ease of installation.
A material suitable for villas, riads and apartments projects
In Marrakech, the real estate projects have various configurations: large volumes under ceiling in the villas, old walls in pise or traditional masonry in the riads, modern apartments requiring space optimizations. The BA13 allows:
-
Quickly create interior partitions.
-
Correcting irregular walls.
-
Easily integrate electrical networks, plumbing or air conditioning.
-
Improve thermal and acoustic insulation.
An asset for thermal comfort
With temperatures above 40°C in the summer, insulation is a major issue. Combined with a high-performance mineral wool or insulation, insulation is also a major challenge. Placo BA13 installation helps to limit the loss of freshness and optimize the efficiency of air conditioning.
Step 1: Preparation of the site prior to installation of BA13 placo
A successful installation always starts with rigorous preparation.
Verification of existing media
Before any intervention, it is essential to:
-
Control the flatness of walls and ceilings.
-
Check the absence of moisture (especially in riads).
-
Identify existing networks (electricity, plumbing).
In Marrakech, some old buildings have irregular or porous walls. A preliminary analysis allows to adapt the laying technique.
Implementation and tracing
Accurate tracking of partitions or dubbings is a key step. It guarantees:
-
Perfect alignments.
-
A respect of the expected dimensions.
-
Optimization of internal volumes.
At SECOND WORK, this phase is performed with a laser level to ensure maximum accuracy.
Step 2: Installation of the metal frame
The frame is the structure that supports the plaster board. It must be perfectly stable and firmly fixed.
Laying of rails and rails
The rails are fixed to the floor and ceiling, and the vertical pillars are inserted at regular intervals (usually every 60 cm).
An ill-positioned bone structure can cause:
-
Vibration.
-
Cracks in time.
-
A bad hold of the plates.
In an environment like Marrakech, where thermal variations can be important, the stability of the structure is essential to avoid future disorders.
Integration of technical networks
Before the bulkheads are closed, provision must be made for:
-
The electrical ducts.
-
Plumbing pipes.
-
The air conditioning passages.
It is at this stage that coordination with the state bodies (electricity, plumbing, air conditioning) is decisive. SECOND WORK, as a second company in Marrakech, ensures this coordination for a smooth and error-free construction site.
Step 3: Installation of insulation (if necessary)
To improve thermal and acoustic performance, an insulation is placed between the supports.
Why isolate in Marrakech?
Even if the climate is warm, insulation plays a crucial role:
-
Reduction of energy consumption.
-
Better thermal regulation.
-
Sound comfort in urban areas.
In dynamic neighbourhoods like Guéliz or Wintering, sound insulation is a real asset for everyday comfort or seasonal rental.
Step 4: Plaque fastening – heart of placo BA13
This is the central stage of the Placo BA13 installation.
Precise cutting and adjustment
The plates must be cut precisely to:
-
Marry the dimensions perfectly.
-
Avoid too wide joints.
-
Guarantee a clean finish.
Approximate cutting causes visible defects after painting.
Plating of plates
The plates are screwed onto the metal frame with regular spacing. Screws must be:
-
Sufficiently depressed.
-
But without tearing the surface carton.
A controlled screwing ensures the solidity and durability of the installation.
Step 5: Treatment of Joints and Finishes
This phase determines the final visual quality.
Application of gasket strips
The strips are placed on the junctions between plates, then covered with coating in several passes.
Improper treatment of the joints may result in:
-
There's some visible cracks.
-
Defects under indirect lighting.
-
An irregular finish.
In contemporary villas in Marrakech, where light games are common, the quality of the finishes is particularly visible.
Sanding and prepainting
Once coated dry, a careful sanding allows you to obtain a perfectly smooth surface, ready to receive paint, wall covering or decoration.
Frequent errors to avoid when installing BA13 placo
Even if the BA13 appears simple to install, some errors can compromise the result:
Neglect the study of moisture
In old riads or buildings, moisture can rise by capillaryness. It is sometimes necessary to opt for suitable water-repellent plates.
Underestimating the importance of the structure
Too light or poorly fixed bones can cause cracks after a few months.
Poor coordination of state bodies
A closed partition without having planned the technical passages requires the reopening of the walls, resulting in additional costs.
Why entrust your BA13 placo pose to a specialized company in Marrakech?
Realizing a partition itself may seem economic. Yet, in a quality real estate project, the result must be irreproachable.
A global expertise in second place
SECOND WORLD intervenes on:
-
Electrical work
-
Plumbing
-
Air conditioning
-
Insulation
-
Wall and floor coverings
-
3D interior decoration & furnishings
This global vision enables the interaction between the different positions to be anticipated.
A perfect knowledge of the local market
In Marrakech, the real estate market is dynamic, especially in high-end renovation projects. The quality of the finishes directly influences the value of the property, whether for sale or for seasonal rental.
One Placo BA13 installation carried out according to professional standards guarantees:
-
Better sustainability.
-
An irreproachable aesthetic.
-
A valuation of the property.
Conclusion: successful pose of BA13 placo in Marrakech
The Placo BA13 installation It is a technical process that requires precision, coordination and knowledge of local constraints, including climate.
In Marrakech, where thermal comfort, aesthetics and real estate valuation are major challenges, each stage must be carried out rigorously: preparation of the support, installation of the frame, insulation, fixing of plates and processing of finishes.
Do you have a renovation or interior design project in a villa, apartment or riad in Marrakech?
- Call for SECOND WORK to benefit from a complete accompaniment in finishing trades and from a Placo BA13 installation carried out in accordance with the rules of Art.
Contact us today to ask for a personalized quote and bring your project to life in complete serenity.
Prev Article: Features, Benefits and Uses in Renovation Next Article: Our advice for a professional result